NHS Tayside has revealed its energy use costs are anticipated to “almost double” in the space of a year.
In the period 2021/22, energy use in NHS Tayside buildings produced 43,877 tonnes of CO2, costing £8.1 million.
Despite efforts to reduce energy consumption by nearly five per cent, NHS Tayside’s energy bill for 2022/23 is expected to rise to £16.4 million.