
Microsoft has ramped up its efforts on the generative AI front over the past few years, integrating the cutting-edge technology across its products and services. However, it's now apparent that AI requires an incredible amount of electricity, computing power, and cooling water to remain operational.
As it turns out, the software giant has seemingly identified a new and effective way to build data centers with new high-temperature superconductors (HTS). The materials foster the flow of electricity with zero resistance and save space, bolstering layout efficiency for data centers (via The Verge).