The attention of the National Highways Authority of India (NHAI) has been drawn to ‘’unattended and incomplete works’’ on the Bengaluru Mysuru Highway and the resultant accidents with a call to resolve them on a priority basis.
The Mandya Deputy Commissioner (DC) Dr. Kumar has written to V.P. Brahmankar, Regional Officer, NHAI, Bengaluru, and not only flagged public safety but pointed out that these issues have been raised continuously by the public and the elected representatives.
In the letter dated October 25, 2023, he has listed 8 works along with their location that are yet to be completed besides the action that needs to be taken by the NHAI apart from balance of works that is still pending in 15 locations.