Get all your news in one place.
100's of premium titles.
One app.
Start reading
Liverpool Echo
Liverpool Echo
National
Gary Porter & Dan Haygarth

M53 closure this weekend for 'mammoth' abnormal load

There will be an overnight closure on the M53 this weekend so a huge new furnace can be delivered to Stanlow Refinery.

The main module of the UK’s first hydrogen-ready furnace being delivered is 26.5 metres long, 18.5 metres tall, and 14.2 metres wide – twice the length of a road-going oil tanker, almost five times higher than a double decker bus and six times wider than a motorway salt spreader. It was shipped from Thailand to the Port of Liverpool in June, before it was transferred to a barge for the short trip across the River Mersey, through the locks into the Manchester Ship Canal and onto a holding bay near National Waterways Museum at Ellesmere Port.

The final stage of the load's 6,000 mile journey will be along the M53 and A5117 to Essar Oil UK’s site in Ellesmere Port.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.