Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Guardian - UK
The Guardian - UK
National

It’s time to consider how we can make the best of HS2

 A worker passes cranes as construction takes place for the transport project HS2 at the Old Oak Common site in London, Britain, 25 September 2023.
An HS2 construction site at Old Oak Common, London. Photograph: Neil Hall/EPA

The rail industry always knew that the key issues for its future were capacity and connectivity, but thought that only the glamour of very high speed trains would persuade politicians (Gold-plated HS2 looks dead. So let’s run the numbers on a bronze-plated design, 22 September). Very high speed trains require complex engineering solutions, greater construction, rolling stock and signalling costs, and have a much greater environmental impact.

The real justification for new capacity was admitted belatedly, but the design of HS2 from London to Birmingham demonstrates the deficiencies of a system built essentially for pure speed: Milton Keynes and Northampton with populations of over 250,000 ignored, no interchange with East West Rail, not even a travelator link to Birmingham New Street station – and far more damaging to the environment than merely higher speeds.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.