
TEL AVIV, Israel — The construction site, like so many others in Israel, is frozen in time.
Just outside of downtown Tel Aviv, the half-built apartment building has been empty for almost a month: conduits of wires hanging loose from the ceiling, piles of unused rebar rusting, water collecting in dirt around the foundation.