‘Taragiri’, the third stealth frigate of project 17A was launched on Sunday by Mazagon Dock Shipbuilders Ltd. (MDL) in Mumbai.
This ship has been built using an integrated construction methodology which involves hull block construction in different geographical locations and integration/erection on Slipway at MDL.
The keel of Taragiri was laid on September 10, 2020 and the ship is expected to be delivered by August 2025.