Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Economic Times
The Economic Times
National
Muskan Singh

In 1959, Auckland opened its Harbour Bridge after 3 years of construction. 10 years later, clip-on sections doubled its capacity from 4 lanes to 8 lanes for city traffic

The Auckland Harbour Bridge is often remembered as a warning about building infrastructure too cheaply. The usual story is simple: Auckland settled for a four-lane bridge in 1959, then had to spend heavily on clip-on lanes just a decade later. But the history in the material provided tells a different story. The smaller bridge helped make the project affordable, and the later expansion delivered four additional lanes at a lower relative cost than building a larger bridge from the beginning, as per a report by Greater Auckland.

The result was an eight-lane crossing that grew alongside Auckland rather than requiring the city to pay for all of that capacity upfront.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.