.jpeg?width=1200&auto=webp&trim=0%2C0%2C0%2C12)
“Eighteen years in, we still don’t have a design for Euston,” laments Thomas Ableman. “And then we wondered why the cost ballooned.”
He is, of course, talking about HS2: the high-speed railway linking London Euston with Birmingham, Manchester and Leeds.