EXPLAINER
The story so far: A report, jointly prepared by two energy-research firms — JMK Research and Analytics and the Institute for Energy Economics and Financial Analysis — says India will likely miss its 2022 target of installing 100 gigawatts (GW) of solar power capacity. This is because of rooftop solar lagging behind, the authors say.