Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Liverpool Echo
Liverpool Echo
Sport
Adam Jones

Exciting new Everton stadium update as Bramley-Moore Dock framework to emerge faster

Everton have explained exactly how they will construct the framework of their new stadium at Bramley-Moore Dock with years of advance planning about to come to fruition.

Work on the 52,888-seater ground on the city's waterfront has been ongoing since July 2021, with numerous exciting updates in the months following those initial enabling processes.

Now, as the initial overground structure beings to emerge from the dock, the Blues are turning their focus to the framework of the stadium - which is set to give a real glimpse of the scale of the project.

Everton's stadium is being pieced together using a method known as Design for Manufacture and Assembly (DfMA), which Ben Townsley, Senior Project Manager at Laing O’Rourke, will be on average 30% quicker than traditional construction.

He told evertonfc.com : “In many ways, it’s a huge complex assembly, rather than traditional construction.

“Concrete is something that has been around since Roman times, but the way in which we are manufacturing it, is pioneering.

READ MORE: Storm Eunice hits Everton travel plans for Southampton match

READ MORE: Frank Lampard confirms stance on Everton appointing a director of football

“In this case, thousands of the building’s components are being precast in our manufacturing facility, which we’ve had now for over 10 years.

“We take the building design, and manufacture bespoke products. Traditionally, we wouldn’t complete the design for the concrete frame until maybe the end of this year, but what we’ve had to do in this instance is design the whole frame much earlier in the process – we actually did it last year.

“The precast concrete elements are all manufactured off-site, before being assembled on-site. This process takes a lot of the potential quality and safety issues away from the work face and into a more controlled environment which minimises waste and improves sustainability.

“Also, rather than needing heavy labour on site to set up the temporary works for pouring the concrete; when you take it away and put it on an assembly line, you are mostly left with on site is lifting and crane work to install the units.”

Work has begun to manufacture the 11,000 pre-cast concrete components which will form the new stadium’s superstructure and internal bowl.

Many of these will come from Laing O’Rourke’s specialist factory in Nottinghamshire, and be transported to site for just-in-time assembly.

By adopting modern methods of construction based on off-site manufacturing, and meticulously planning production schedules in advance, Laing O’Rourke’s technical team has been able to use less cement in the concrete mixes for these components and so reduce the overall embodied carbon in the stadium build.

These manufactured building blocks will arrive on site in a pre-determined order and effectively be slotted together utilising 3D modelling, in turn forming the floors, walls, and supporting pillars in preparation for the steel skeleton and brickwork skin.

“It takes a huge amount of up-front design resource to coordinate this.," Townsley added.

“The services are not actually cast into the concrete elements, but the voids need to be cast into the structure so the wiring and plumbing can be installed.

“That sounds simple, but it’s an incredibly complex process. You can imagine the number of different pipes and wires within a building of this magnitude and all that has been designed using 3D modelling.

“That 3D environment is a big part of the pioneering aspect. We call this the ‘digital build’, where our engineers, who would normally be working on-site in the mud, have been trained up-front in 3D modelling.

“They’ve taken structural engineers’ designs and re-drawn the whole building in a 3D environment.

“Using this method establishes all the clashes, complications and problems you might normally encounter before you get to site, which allows them to be resolved before you even start.

“We’ve used the method before on other structures, but this is the first time we have done it to this scale, and that means we can give the people on site – the joiners and steelfixers who are actually building the stadium – 3D models on tablets, rather than a piece of paper.

“When you transition into this 3D world it is a huge leap that we’ve taken to modernise the industry, but I am completely convinced this is the right way to go.

“We have to become more efficient, increase productivity and provide certainty for our clients, and this is the way to do it.”

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.