Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

Dry run of first PRLIS pump taken up successfully

In a major step forward in the implementation of Palamuru-Rangareddy Lift Irrigation Scheme (PRLIS), the engineers of Irrigation Department and those of the contract agencies including MEIL conducted dry run of the first pump of Narlapur pump-house of the project near Yellur in Nagarkurnool district on Sunday.

The dry run was supervised by Special Chief Secretary Rajat Kumar, Engineer-in-Chief C. Muralidhar, Advisor to Government on Lift Irrigation K. Penta Reddy and Chief Engineer M.A. Hameed Khan. The Narlapur pump house would have a total of nine pumps of 145 megawatt capacity each to lift water to 104 metres height and put it into Narlapur reservoir with a storage capacity of 8.51 tmcft.

According to the authorities, Mr. Rajat Kumar, Mr. Muralidhar, Mr. Penta Reddy and others participated in a ‘puja’ programme before the engineers took to the dry run of the first pump. The pump houses near Yedula and Vattem reservoir would have 10 pumps each to lift water to a height of 124 metres and 121 metres height, respectively, the pump house at Uddandapur reservoir would have five pumps – all of the 145 MW capacity – to lift water to a height of 122 metres.

Work on two pumps in the pump house at Narlapur, three each at Yedula and Vattem reservoirs has been completed already.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.