Get all your news in one place.
100’s of premium titles.
One app.
Start reading
AAP
AAP
National
Finbar O'Mallon

Lower Warragamba before floods, locals say

Warragamba Dam provides Sydney's drinking water and could limit its supply if partially drained. (Dan Himbrechts/AAP PHOTOS) (AAP)

Local residents are pushing for Sydney's Warragamba Dam to be partially drained ahead of flood events, instead of its wall being raised under a mitigation proposal by the NSW government.

Warragamba provides Sydney's drinking water, the supply of which could be limited if the dam level is lowered.

Proposals to raise the wall have been slammed by UNESCO conservationists out of concern for the Blue Mountains.

The state government wants the federal government to split the proposed $1.6 billion cost of raising the dam wall at a time when state coffers are stretched due to the COVID-19 pandemic.

The Hawkesbury Community Alliance instead wants the dam drained by up to 12 metres before floods arrive.

"Our community needs flood mitigation now, not in the distant future. Ten years is too late," spokeswoman Samantha Magnusson said.

Lowering the dam's full supply level was "the best option for urgent flood mitigation for the community, who are filled with fear and uncertainty about what ... coming weeks might bring," she said.

Meteorologists have warned Australia is in for a third year of La Nina weather, meaning more rain for NSW as it grapples with the devastating fallout of two recent major floods.

Hawkesbury locals heard from a University of NSW engineering expert, Dr Stuart Khan, on Saturday who said slightly draining the dam ahead of floods threatened Sydney's drinking water supply.

Dr Khan said other water sources would be needed to help prop up the water supply if Warragamba needed to be drained.

"Reducing the current water storage in Warragamba Dam is a realistic alternative to raising the dam wall," he said.

"No solution provides complete protection from flooding, maintaining a lower water storage in Warragamba can significantly mitigate many floods, reducing peak flood heights and enabling additional evacuation time."

A recent independent report and a separate parliamentary inquiry on NSW's flood response suggested raising the dam wall could delay key infrastructure flooding by 11 hours, including the vital evacuation route on Windsor Bridge.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.