Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

Daytime traffic resumes on Gap Road

Daytime traffic on the Gap Road stretch of the Kochi-Dhanushkodi National Highway (NH85) in Munnar resumed on Monday morning. Traffic on the stretch was suspended after heavy rain triggered a major landslip along the Chemmannar stretch of the Gap Road on Friday. According to Idukki Collector Sheeba George, single line traffic was allowed on the stretch from 6 a.m. to 6 p.m. “The traffic ban from 6 p.m. to 6 a.m. will continue till further notice,” said the Collector.

Officials said police personnel had been deployed on the Chemmannar stretch to ensure single-line traffic. The stretch is one of the major routes connecting Munnar and Thekkady and Munnar and Bodimettu in Tamil Nadu.

There were allegations that unscientific road-widening works had triggered the landslips. Rocks were blasted simultaneously at various spots which shook sensitive layers of rocks, causing serial landslips on the stretch, it was alleged.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.