Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

CM lays foundation for double decker elevated corridor

Chief Minister A. Revanth Reddy laid the foundation stone for the construction of the 5.320 km Double Decker Corridor near Kandlakoya Junction on Saturday, which is expected to end the decades-long hardships faced by motorists on the National Highway (NH)-44.

Metro Rail line will also be built on this elevated corridor in the next phase. The cost of the project is estimated to be ₹1,580 crore.

The Corridor starts from Paradise Junction in Secunderabad on NH-44 and ends at Dairy Farm Road moving through Tadband Junction and Bowenpally Junction. The total length of this corridor is 5.320 km. The elevated corridor will be developed on 4.650 km stretch along with an underground tunnel which will be 600 metres long. There will be 131 piers (pillars) and the elevated corridor will be constructed in six lanes.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.