Three years after the violent clash between Indian and Chinese forces in Galwan followed by tanks facing each other around the Pangong Tso — a lake spanning eastern Ladakh and western Tibet — there is hectic activity in the area from both sides. While China is rushing to complete a bridge across the Pangong Tso, connecting the north and south banks, India is also building a black-topped road on its side on the north bank.
These are among a number of infrastructure developments initiated on both sides since the standoff, permanently altering the status quo on the ground in eastern Ladakh, even as the two sides await the 19th round of Corps Commander level talks to find a resolution to their dispute in the region.
“Construction of black-topped road towards Finger 4 on our side is on and is expected to be completed by 2025. There is major impetus on infrastructure, road networks, advanced landing grounds and so on,” an official source said, on condition of anonymity. This was also confirmed by another official source. In addition, construction work is at an advanced stage on the alternate axis to the critical Darbuk-Skyok-Daulat Beg Oldie road through the Saser La, the source stated.