Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Times of India
The Times of India
World
Vishant Agarwala

Bodies Recovered In Chilime Tunnel: Indian, Nepali teams dig by hand; search on for sixth worker

Five bodies were recovered from Nepal’s flood-buried Chilime hydropower project on Wednesday after specialised Indian Army personnel and Nepalese rescuers reached its underground powerhouse by digging the final stretch by hand when excavators and wheel loaders could advance no farther. Six workers were believed trapped inside after the Aug 26 disaster, and search continued for the remaining worker.

Get breaking news anytime, anywhere. Download the TOI app now!

The operation began in severely waterlogged conditions and the team used safety ropes and improvised floats to enter the tunnel. Heavy machinery subsequently cleared much of the mud, boulders and debris, but rescuers had to adopt a rat-hole-style technique to manually cut through the final 35 metres of an approximately 150-metre obstruction leading towards the powerhouse.

The method resembled the manual excavation used during the 2023 Silkyara tunnel rescue in Uttarakhand, where rat-hole miners cleared the final portion after drilling machinery became ineffective. At Chilime too, personnel crawled into the restricted space and removed debris by hand as teams outside carried it away.

Hopes of finding survivors had briefly risen after engineer Shriram Neupane reported what appeared to be voices or echoes from deeper inside the tunnel. “We are expecting some good news,” Neupane had said on Monday, expressing confidence that a breakthrough was expected within hours.

Ruling Rastriya Swatantra Party MP and engineer Sagar Dhakal, who worked alongside rescue teams for several days, said, “I tried my best as an MP, engineer, Nepali and a normal human being, leaving no stone unturned. I carried the heavy load where it was necessary to carry it, and I was the labourer where it was necessary to be."

Dhakal said the operation repeatedly ran into technical setbacks before teams found a way through. He thanked Chilime engineers, Nepal Army, Indian Army, Nepal Electricity Authority personnel and locals for working around the clock.

The floods had also hit 12 hydropower projects in Nepal — eight operational plants with 281MW capacity and four under construction with 388MW capacity. The disaster has so far left 1,442 people dead and around 5,719 missing across Nepal and Tibet.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.