“Everything leaks,” says Philippa Simpson, the director of buildings and renewal at the Barbican, who is standing outside the venue’s lakeside area and inspecting the tired-looking tiles beneath her feet.
Water seeps through the cracks into the building below and serves as a reminder of the job facing Simpson and the team who are overhauling the 43-year-old landmark.