Get all your news in one place.
100's of premium titles.
One app.
Start reading
Top News
Top News

Baltimore Bridge Demolition Scheduled For Sunday After Weather Delay

Demolition crews cut the top portion of the north side of the collapsed bridge into smaller sections in Baltimore

Crews are set to move forward with a plan to use small explosives to break apart a massive chunk of the Baltimore bridge that collapsed on a cargo ship six weeks ago. The controlled demolition is tentatively scheduled for Sunday around 5 p.m., according to the US Coast Guard.

The demolition was originally planned for Saturday but was postponed due to adverse weather conditions. The goal of the demolition is to assist in removing debris and freeing the 213-million-pound Dali cargo ship, which collided with a pillar of the Francis Scott Key Bridge on March 26, causing it to collapse into the water below. The incident resulted in the tragic deaths of six construction workers and disrupted a vital transportation route, posing a threat to the economy at the Port of Baltimore.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.