Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Guardian - UK
The Guardian - UK
Comment
William Atkins

A new nuclear power station needs a vast supply of water. But where will Sizewell C get it from?

The proposed Sizewell C nuclear energy plant.
‘A reactor of the kind EDF plans to build needs water in very great volumes.’ Photograph: EDF

Last week, the government gave the go-ahead for a new nuclear power station to be developed on the Suffolk coast. Providing low-carbon electricity for about 6m homes, Sizewell C will stand alongside two existing stations, Sizewell B and the decommissioned Sizewell A. I live close enough to see the 60-metre tall, white dome of Sizewell B almost every day. When I want to torture myself, I look at developer EDF’s “construction phase visualisations” of the 1,380-acre building site, with its towering spoil heaps and forest of cranes, and wonder if this is what it will take to save the planet.

What might not have been immediately obvious in the coverage of the government’s decision was that the Planning Inspectorate, tasked with assessing such projects, had recommended that permission be refused. The problem, the examiners explained, was fairly simple: EDF couldn’t say exactly where it would obtain one of the main substances needed to make a nuclear power station work, that substance being water.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.